Intertest Ltd provided a full scope of engineering for replacing the old protection devices and the old control desk of a power plant.

Now the control of the electrical systems of the power plant, including two generators, is from the new SICAM SCC system. The generators are automatically synchronizing using a 7VE85 device.

Intertest Ltd provided the following services:

– Design of the new system

– Delivery of the new system

– Configuration of the new system

– Installation works

– Commissioning works